Prepared by Ashley Moscrop, Managing Director, Dufaylite Developments Ltd
Reviewed by Nigel West, Technical Manager
Last updated: 22 October 2026
Key takeaways
- NHBC heave precautions give shrinkable clay a void or compressible layer to swell into, so heave does not lift ground beams, pile caps, suspended floors or the structure they carry.
- The depth of that void is set by the clay’s volume change potential, which is calculated from its Plasticity Index; engineers take the figures from the current NHBC Standards Chapter 4.2.
- Trees that are existing, removed and proposed all count in NHBC heave precautions, so clearing a plot can start heave rather than end it.
- Three material routes provide the void: compressible expanded polystyrene (EPS), paper honeycomb that weakens when wetted, and polypropylene void formers.
- Paper honeycomb is around 30% thinner than an EPS equivalent: 160mm against about 225mm for a 150mm void, so up to about 65mm less dig.
NHBC heave precautions matter more than usual this autumn. The Met Office confirmed summer 2026 as the hottest on record, Hastings Direct reported August subsidence claims almost 140% higher than a year earlier, and ABI data shows a record £20,000 average settled domestic subsidence claim in Q2 2026 (Insurance Business, 2026). Clay that shrank in the drought moves the other way as moisture returns. That movement is heave.
Heave is the movement NHBC heave precautions exist to accommodate. This guide explains what Chapter 4.2 asks of the specifier, how each foundation element is protected, how the three material routes compare, and what belongs on the drawing before it goes out.
What are NHBC heave precautions?
NHBC heave precautions are the measures that NHBC Standards Chapter 4.2 requires where foundations sit in shrinkable clay that could swell, typically near trees that are existing, removed or proposed. They give the clay somewhere to go: a void or compressible layer beside and beneath ground beams, pile caps and suspended floors, so the swelling ground has room to move without lifting the structure.
The National House-Building Council (NHBC) sets the technical standards for the new homes it warranties, and Chapter 4.2, “Building near trees”, is the chapter engineers turn to for clay. The key idea is simple. You cannot out-muscle swelling clay by making the concrete stronger, because the uplift pressure from a saturated clay can be very large. So the precaution is space, not strength.
A void former holds that space open while the concrete is poured, then gets out of the way once the structure can carry itself. How it gets out of the way separates the material routes. For the wider picture of the problem itself, see our explainer on what ground heave is and how to prevent it.
Which NHBC Standards edition applies to your site?
The edition that applies is set by when the foundations on the plot begin, so check the date before you cite a clause. NHBC published NHBC Standards 2026 on 5 January 2026 and says it applies to NHBC-registered homes where the foundations begin on or after 1 January 2026 (NHBC, 2026).
NHBC describes the changes in that edition as mostly minor. Even so, a specification for NHBC heave precautions that quotes an older edition reads as out of date to a reviewer, and a technical query costs more time than the check. The practical rule is to confirm the edition against the foundation start date for the plot and name it in your specification.
If you have been searching for an NHBC heave precautions PDF, go to the source rather than a copy. NHBC publishes the Standards on its own site, and the current NHBC Standards are the version to design to. Uploaded copies of older guides circulate widely and are easy to mistake for the current text.
When does Chapter 4.2 call for NHBC heave precautions?
Chapter 4.2 calls for NHBC heave precautions when shrinkable clay, trees and foundation depth combine to put the structure at risk of upward movement. The heave precautions foundations need depend on four things, and the engineer works through each one from the site investigation.
The soil. Heave only matters in shrinkable soils, mainly clays. Chapter 4.2 classes them by volume change potential: high, medium or low. Volume change potential describes how much a clay can shrink and swell as its moisture content changes. It is calculated from the clay’s Plasticity Index, a laboratory measure of the range of moisture content over which the clay behaves plastically. The higher the volume change potential, the more room NHBC heave precautions have to give.
The trees. NHBC Chapter 4.2 building near trees guidance counts every tree that can influence the ground: trees that are there now, trees that have been removed and trees that are proposed in the landscaping. Each species has a water demand, and its mature height and distance from the foundation set how far its influence reaches.
The foundation. Where trees push the required foundation depth down, the foundation often becomes piles and ground beams with a suspended floor. That is the arrangement where NHBC heave precautions do most of their work, because the beams and the floor sit in the clay that will swell.
The tables and calculator. People search for the NHBC building near trees tables because they turn these inputs into a foundation depth and a precaution. Use them from the current Chapter 4.2 on the NHBC site. We explain them here, but we deliberately do not reproduce them: a copied table goes out of date, and the engineer’s signature sits on the current one.
What NHBC heave precautions ask of each foundation element
NHBC heave precautions ask the same thing of every element in the clay: leave room for the ground to rise without pushing on the structure. What changes from one element to the next is where the space goes and what provides it. The table summarises it in our own words. The figures themselves come from the current Chapter 4.2.
| Foundation element | What the precaution does | How the void or compressible layer is sized | Typical material routes |
|---|---|---|---|
| Ground beams and pile caps | Gives the clay room to rise beneath the beam or cap, and room to move against its sides where Chapter 4.2 requires it, so heave does not lift the beam off the piles | By the clay’s volume change potential, calculated from its Plasticity Index; take the figure from the current Chapter 4.2 | Paper honeycomb void former; compressible EPS; polypropylene void former |
| Suspended ground floor (in-situ concrete) | Keeps a void between the clay and the underside of the slab, so the floor spans between the beams and the ground can rise into the space | By volume change potential; see the current Chapter 4.2 | Paper honeycomb void former; compressible EPS; polypropylene void former |
| Suspended ground floor (precast or beam and block) | Keeps a clear space beneath the floor units, which span between supports and sit above the clay | By volume change potential, allowing for any ventilation space the floor also needs; see the current Chapter 4.2 | The open void beneath the floor itself; a void former only where the detail needs one |
| Ground-bearing slab | Chapter 4.2 restricts ground-bearing slabs on shrinkable clay where heave is expected, because the slab rests directly on the ground that will move | Not the usual answer where heave precautions apply; the engineer normally moves to a suspended floor | Suspended floor with a void, as above |
| Trench-fill foundation sides | Places a compressible layer against the side of the foundation where Chapter 4.2 requires it, so swelling clay does not grip and lift the concrete | By volume change potential and foundation depth; see the current Chapter 4.2 | Compressible material against the trench face, as the engineer specifies |
Two points follow. First, under NHBC heave precautions the void depth is a design output, not a product choice: the soil sets it, and the product follows. Second, the void is not the same as the panel. A product has to be thicker than the void it provides, because something has to remain beneath the concrete once it gives way. That difference is where dig depth is won or lost. There is more detail on beam-level design in our guide to void formers for ground beams.
How the three material routes meet NHBC heave precautions
Three material routes meet NHBC heave precautions, and each one creates the void in a different way. All three hold the space open during the pour, then stop resisting the clay. They differ in thickness for a given void, in whether anything must happen after the pour, and in what stays in the ground.
Compressible EPS. Expanded polystyrene (EPS) void formers are designed to compress as the clay swells. Because the compressed material is still there, the panel has to be thicker than the void it provides. For a 150mm void, an equivalent EPS void former is about 225mm thick. That extra depth is extra excavation along every beam and under every floor. Our article on compressible void formers looks at this route in more detail.
Paper honeycomb that weakens when wetted. A paper honeycomb void former carries the pour while it is dry: fresh concrete, reinforcement and foot traffic during construction. Once the concrete has achieved self-supporting strength, water introduced through the Voidpak system weakens the paper core and switches off its strength. The panel then yields to heave. Because the core gives up its strength rather than compressing, the panel only needs to be slightly thicker than the void: 160mm for a 150mm void.
Polypropylene void formers. A third route, now common on heave projects, uses polypropylene units designed to give way under heave. Products differ in how they give way, in thickness for a given void and in whether any action is needed after the pour. Check each manufacturer’s data and certificate for the specific product.
| Paper honeycomb (weakens when wetted) | Compressible EPS | Polypropylene void formers | |
|---|---|---|---|
| How it accommodates heave | Water weakens the core and switches off its strength; the panel yields | Compresses as the clay swells | Designed to give way under heave; mechanism varies by product |
| During construction (dry) | Carries fresh concrete, reinforcement and foot traffic | Carries the pour | Carries the pour; check product data |
| Panel thickness for a 150mm void | 160mm | About 225mm | Varies by product; check the manufacturer’s data |
| Water introduced after the pour | ✓ Yes, through the Voidpak system | ✗ No | Check product |
| What stays in the ground | Paper core biodegrades; polypropylene facings stay | EPS stays in the ground | Check product |
Choosing a route for NHBC heave precautions is an engineering decision. Each route can provide the space NHBC heave precautions call for. What the table shows is the trade: thickness and dig against the extra step of introducing water. To see how paper honeycomb protects ground beams and suspended floors on clay, visit our ground heave solutions page.
Ground heave after tree removal: why the site keeps moving
Removing a tree does not remove the need for NHBC heave precautions; it often creates it. A mature tree draws water from the clay around its roots, and over the years that clay dries and shrinks. When the tree is felled, the water demand stops but the clay is still dry.
Rain and groundwater then rewet the clay, and it swells back towards its natural moisture content. That recovery is slow and uneven, and it can go on for years after the tree has gone. A foundation built into that recovering ground feels the swelling as upward pressure on its underside and sides.
This is why NHBC heave precautions account for removed trees as well as existing and proposed ones. A cleared plot can look like the easy case. In engineering terms it can be the harder one, because the clay has further to recover. The client who took the trees out last year has not solved the problem; they have started the clock on it.
The answer is the same precaution, sized correctly: a void or compressible layer set by the clay’s volume change potential, with the tree’s influence taken from the Chapter 4.2 tables. For how this plays out under houses and extensions, read our guide to clay heave protection for foundations.
How to show NHBC heave precautions on the drawing
A drawing that shows NHBC heave precautions clearly gets built correctly. The groundworker installs what the drawing shows, so the detail needs to leave nothing to guess. For a paper honeycomb void former, the drawing should cover these steps in order.
- State the void depth for each element. Give the void beneath each ground beam, pile cap and suspended floor, and the panel thickness that provides it.
- Include a panel schedule. List the panel references and quantities by area, so the order and the install match the design.
- Specify the base. Show a prepared, level, compacted base with 25mm of sand blinding. The sand blinding protects the polythene; the void former never sits directly on sand.
- Show polythene below and above. A polythene membrane goes on the sand blinding under the panels, and a second layer goes over them before the concrete. The panels are laid in a single layer, edge to edge and wall to wall, fully supported on the membrane.
- Keep the void former dry until the concrete is self-supporting. Note it on the drawing, so nobody introduces water early.
- Mark the Voidpak pipe positions. Show one pipe per ground-beam panel, and floor pipe coverage as set out in the certificate.
- Name the product and its certificate. The specification clause should name the product, the certificate number and the issue.
That last step matters when a checker reviews NHBC heave precautions. If your specification calls for a BBA-certified void former, the certificate number and issue let a checker confirm it in minutes. We review foundation drawings for exactly these points: send us your foundation drawing and the soil report.
Five checks before you issue the drawing
Five checks catch most of the queries that come back on NHBC heave precautions. Run them before the drawing leaves the office.
- Which NHBC Standards edition applies? Confirm it against the foundation start date for the plot, and cite it.
- What is the clay’s volume change potential? Take it from the site investigation, calculated from the Plasticity Index.
- Is every tree accounted for? Existing, removed and proposed, with species, mature height and distance.
- What void or compressible depth does each element need, and what provides it? Ground beams, pile caps and suspended floors, each with the material and panel thickness.
- Is the installation and water-introduction sequence on the drawing? Base, sand blinding, polythene, dry until self-supporting, Voidpak pipe positions, and the certificate reference.
If any answer is “not sure”, resolve that check first: NHBC heave precautions are only as good as the inputs behind them.
Where Clayboard® fits
Clayboard®, Dufaylite’s paper honeycomb void former, is the paper honeycomb route to NHBC heave precautions described above. It carries the pour while it is dry. Once the concrete has achieved self-supporting strength, water introduced through the Voidpak system weakens the paper core and switches off its strength.
Once wetted, Clayboard® limits the pressure on the slab to under 3 kN/m². Reinforcement design remains the engineer’s call. Clayboard® is around 30% thinner than an EPS equivalent: 160mm against about 225mm for a 150mm void, so up to about 65mm less dig for the same void.
The British Board of Agrément (BBA) assesses construction products for use in the UK. Dufaylite holds BBA Certificate 98/3528 (Issue 4, 27 June 2024) for Clayboard®.
Clayboard® complies with NHBC guidance, and Chapter 4.2 is the chapter engineers refer to for heave precautions. Panels measure 2440 × 1000mm and come in four thicknesses: 60, 85, 110 and 160mm, providing 50, 75, 100 and 150mm voids. Clayboard® is supplied through builders’ merchants and appointed distributors, and made in St Neots by Dufaylite, the sole UK paper honeycomb manufacturer.
Paper honeycomb is the wrong answer in some places, and we would rather say so. Do not use Clayboard® at depths greater than 2m, below the water table, or where soil gas protection is required. There, specify a different solution. If you are weighing whether a slab needs a void at all, our article on the void under a concrete slab covers that decision.
Frequently asked questions
What are heave precautions?
Heave precautions are the measures a foundation design uses to stop swelling clay lifting the structure. NHBC heave precautions, set out in NHBC Standards Chapter 4.2, provide a void or compressible layer beneath and beside ground beams, pile caps and suspended floors on shrinkable clay near trees. The clay swells into that space instead of pushing on the concrete. The depth of the space depends on how much the clay can swell, which the engineer takes from the site investigation and the current Chapter 4.2.
What is heave protection for foundations?
Heave protection to foundations is the physical layer that creates the space NHBC heave precautions require. In practice it is a void former laid under ground beams and suspended floors, or a compressible layer against the sides of a foundation. Foundation heave protection holds its shape while the concrete is poured, then stops resisting the clay: EPS compresses, paper honeycomb weakens once water is introduced, and polypropylene units give way. The engineer chooses the material and the depth for the site.
Does a compressible void former meet NHBC heave precautions?
A compressible void former can meet NHBC heave precautions, and so can a paper honeycomb void former that weakens when wetted. Both provide the space Chapter 4.2 asks for. What the engineer checks is whether the product provides the void depth the clay needs, and whether its certificate covers the use. A compressible void former needs to be thicker than the void it provides, which adds to the dig. Ask for the certificate number and issue, and check the product data for the void it delivers.
What void dimension does NHBC require under ground beams and suspended floors?
NHBC heave precautions set the void or compressible-layer depth by the clay’s volume change potential, which is calculated from its Plasticity Index. High volume change potential needs the largest allowance and low the smallest, and the figure differs between ground beams and suspended floors. Take the current figures from NHBC Standards Chapter 4.2 rather than an older copy, and remember the void is not the panel thickness: the product must be thick enough to deliver the void once it gives way.
What happens to heave risk after a tree is removed?
Heave risk often rises after a tree is removed. The tree dried the clay around its roots; once it is felled, the clay takes up water again and swells, and that recovery can go on for years. That is why NHBC heave precautions count removed trees alongside existing and proposed ones. The engineer sizes the void or compressible layer for the recovering ground, using the tree’s water demand, mature height and distance from the foundation, taken from Chapter 4.2.
What’s the thinnest compliant void former we can use to minimise dig depth?
For a given void, a paper honeycomb void former that weakens when wetted is the thinner route because it does not rely on compression. Clayboard® is around 30% thinner than an EPS equivalent: 160mm against about 225mm for a 150mm void, so up to about 65mm less dig. Compliance and void depth are still set by the engineer for the site, under NHBC heave precautions and the product’s certificate. Send us the soil report and drawing and we will recommend the panel.
Send us the drawing
Clay sites near trees will keep testing foundation designs as soils rewet, and NHBC heave precautions shown clearly on the drawing are what protect the structure. If you are working through NHBC heave precautions on a scheme now, send us the soil report and foundation drawing. We’ll come back within two working days with a void depth recommendation, a panel schedule and a quotation, and we reply to every enquiry within one working day. If your team would rather start with the principles, ask about our lunch-and-learn CPD on ground heave.